skip to main | skip to sidebar

ELECTRICAL COACH CARE

कभी सोचा है कैसे और क्या है उस कोच की कहानी जिसमे आप मुंबई से बैठ कर गंतव्य तक सुकून से जाते हैं? मुंबई मंडल के इलेक्ट्रिकल कोचिंग स्टाफ की कडी मेहनत से आप ठंडे ठंडे ऐ.सी. में २०० लक्स के प्रकाशित कोच में गर्मागर्म खाना खाते हुए यात्रा करते हैं . हर दिन, हर मौसम, साल दर साल. (Find me at facebook with indiwindy@gmail.com)

Tuesday, June 21, 2011

Double Decker Panel Problem







Posted by Rajesh Gupta at 8:20 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Equipments

The Earth Leakage INDICATION relay

Posted by Rajesh Gupta at 8:18 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

ERRUs. All different inside the box.





Posted by Rajesh Gupta at 8:06 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Equipments
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Labels

  • 100 days failure meeting. (1)
  • 1100 AH VRLA Battery (1)
  • 25 KW alternator (1)
  • AC Coaches (3)
  • AC fans in new TL coaches (1)
  • AC Video (2)
  • ACCI Lobby (1)
  • Battery (1)
  • BCT division's first wind turbine inaugurated. (1)
  • Berth Reading Lamps (1)
  • Bulk Inverters (1)
  • CESE Conference (1)
  • Coach Cerificates (1)
  • Coach Maintenance (2)
  • Coach Mechanics (1)
  • Coaches (2)
  • Coachind depots (1)
  • Coaching Depots (2)
  • DM Plant (1)
  • Electrical Coaching Maintenance (2)
  • Electronic Ballast (1)
  • Emergency Light (2)
  • Endless Inventry (1)
  • Equipments (10)
  • ERRU (2)
  • Filters (1)
  • Fuses (3)
  • Harting Connectors (1)
  • highlights (1)
  • HOG (2)
  • ICF (2)
  • June-10 Kochkhabar (1)
  • LHB Coaches (6)
  • Lights in Coach (1)
  • LOad Chart (1)
  • M & P (1)
  • Manual operation (1)
  • Mobile charging points (1)
  • New LHB Shatabdi. (1)
  • New Log Books (1)
  • OVP (1)
  • Pantry equipments (2)
  • POH Issues (1)
  • Power Car (2)
  • Power Factor (1)
  • RCF (2)
  • RMPU (3)
  • Rotary Changeover Switch (1)
  • Safety (2)
  • Safety Items (2)
  • Solenoid- a common device in AC plants of coaches (1)
  • System improvement (1)
  • T&P (1)
  • Thermal gun (1)
  • Tools and Plants (1)
  • train lighting (1)
  • Underslung AC Plant (1)
  • Workshop (1)

Jagadhri Workshop

Mumbai Coaching Depot in Pictures

AMC DATA

  • POWER CAR DG SET MAINTENANCE
    Working Conditions - The contractor shall depute the service engineer as per the maintenance schedule defined in the contract at LTT /WB/CSTM for breakdown calls. Service Engi...
    11 years ago
  • RMPU AMC OF MUMBAI DIVISION CENTRAL RAILWAY ( M/S FEDDERS LLOYD )
    Tools List - *A**N**N**E**X**U**R**E- C1* *LIST OF TOOLS TO BE KEPT AT ANY POINT OF TIME BY THE CONTRACTOR* *S**. N* *I**t**e**m* *C**o**a**c**h holding of the d...
    11 years ago


V Belts

  • WR Stock position
  • CR Stock Position

25 KW Tension Device Assembly

  • CR Stock

40 Amps Fuse

  • WR Stock

Monoblock Pump

  • WR POH Kit
  • WR Stock Position
  • CR Stock Poistion

120 Ah Batteries

  • CR Lead Acid
  • WR VRLA
  • WR Lead Acid
  • WR SMF VRLA
  • WR VRLA
  • CR VRLA

1100 Ah Batteries

  • WR VRLA
  • WR VRLA with inverter
  • WR VRLA
  • VRLA
  • CR : LMLA

800 Ah batteries

  • WR Stock
  • CR Stock

Bogie Bush

  • CR Stock

Alternator Bush

  • CR Stock

Berth Reading Light

  • WR LHB Transverse LH Stock
  • WR LHB Upper Berth Stock
  • WR LHB- Transverse Berth RH stock
  • WR LHB- Longitudinal Berth Stock
  • WR Stock position coventional
  • CR Stock position
  • CR Stock position 25 W Screw Lamp

4.5 KW Tensioning Device Assembly

  • CR Stock

11 W Electronic Ballast

  • WR Stock
  • CR Stock

Blower Motor Carbon Br

  • WR Stock
  • CR Stock

BLDC Fan

  • WR Stock
  • CR Stock

25 W Lamp

  • CR Stock
  • WR Stock

16 A HRC Fuse

  • CR Stock

Fan Carbon Brush

  • CR Stock
  • WR Stock (Different Spec than CR)

18 W tube light

  • CR Stock

18 W Electronic ballast

  • CR Stock
  • WR Stock

Blog Archive

  • ►  2016 (2)
    • ►  September (1)
    • ►  July (1)
  • ►  2015 (1)
    • ►  March (1)
  • ►  2014 (8)
    • ►  November (1)
    • ►  August (2)
    • ►  July (1)
    • ►  June (1)
    • ►  April (1)
    • ►  February (2)
  • ►  2013 (29)
    • ►  December (1)
    • ►  November (4)
    • ►  September (1)
    • ►  June (5)
    • ►  May (1)
    • ►  April (4)
    • ►  March (2)
    • ►  February (6)
    • ►  January (5)
  • ►  2012 (13)
    • ►  December (4)
    • ►  November (1)
    • ►  October (1)
    • ►  September (1)
    • ►  August (2)
    • ►  July (4)
  • ▼  2011 (8)
    • ▼  June (3)
      • Double Decker Panel Problem
      • The Earth Leakage INDICATION relay
      • ERRUs. All different inside the box.
    • ►  April (2)
    • ►  March (3)
  • ►  2010 (10)
    • ►  October (1)
    • ►  August (2)
    • ►  July (2)
    • ►  June (2)
    • ►  May (1)
    • ►  March (1)
    • ►  February (1)
  • ►  2009 (11)
    • ►  September (1)
    • ►  August (1)
    • ►  July (1)
    • ►  June (2)
    • ►  May (6)

Outsourced Works of BB Divsion


Conventional RMPU AMC ( Amit): Till-14.09.2013, Rs,5.75 crore.( LOA No L.724.TL-AC.AMC.RMPU.2010 dt.22.02.12. )

LHB RMPU AMC: (Sidwal), Rs 51.68 lakh For 3 years LOA NoBB/LG/W/CSTM/2013/1 Till 09.04.2016

VVVF drive AMC( Sr Sai Works) Till-31.01.14, Rs.1.41 lakh LOA No

25 KVA Inv AMC Medha for three years from 11.02.13 to 10.02.16 LOANo BB.LG.W.CSTM.2012.29 dt. 08.02.13, qty-90.83 coach year, Rs.98.68 lakh.

25 KVA Inv AMC Hirel for three years from 05.04.12 to 04.04.15 LOA No. BB.LG.W.CSTM.2011.28 dt.05.04.12

25 KVA Inv AMC Hind for three year from 01.09.12 to 31.08.15 LOA No BB.LG.W.CSTM.2012.06

25 KVA Inc AMC Siemens for three years from 15.02.13 to 14.02.16 LOA No.BB.LG.W.CSTM.2012.05 dt. 08.02.13, Rs.7.75 crore

25 KVA Inv AMC Autometers for three years from 01.02.13 to 31.01.16 LOA No. BB.LG.W.CSTM.2012.08 dt.31.03.13, Rs. 1.81 crore

TL Coaches Primary:(Debidas) , Rs. for 1 yearLOA No BB/LG/W/CSTM/2010/27 till April 2014: Schedule has six parts( AMC TL 155, AMC Associate TL 76, Elecetrical Works 15, Escorting 11, TRip-TL 14924, TRip-AC 4784)

Truck Hiring( Chandan Engg Works) Rs. 24 lakh for 3 years. Till 2015 LOA No. BB.LG.W.CSTM.

Small Vehicle Hiring ( Chandan) Rs 7 Lakh for 3 years Till 2015 LOA No

AC Coach Attendants (Piyush Traders) Rs.1.84 crore for 1 year, till-14.10.13 LOA No. BB.LG.W.CSTM.2012.21 dt.21.08.12

Deccan Odyssey Power Car(Dhara) for 2 years, Till 2013

LTT-ALD Power Car AMC-Escorting(BHEL) for ALD Rs. for 2 years Rs 1.75 Crore

LTT-HW PowerCar AMC-Escorting (DHARA) HW+ERN Rs. for 2 years Till Sept 2013 Rs.

LTT DEPOT

Most important depot of BB division.

Vidarbha And Konark Exp Being Maintained at Wadibunder Depot

Vidarbha And Konark Exp Being Maintained at Wadibunder Depot

WB DEPOT

Wadibundar depot


CSTM Depot

This depot

MZ DEPOT

Mazgaon depot

DR DEPOT

Dadar

How Much Maint/Traffic Spare Should be there?

How Much Maint/Traffic Spare Should be there?

Spares

Spares

Spare coaches

Spare coaches

Sites Related to Coaches

  • ICF Approved list
  • RCF Approved list
  • RDSO Approved list
  • ICMS report
  • ML Position
  • SMIs
  • Modification Sheets
  • HVAC Contractors
  • RDSO PS Directorate
  • Rail Coach Factory , Kapurthala
  • Integral Coach Factory,Chennai

CR BB division budget

D 530-32 power car maint ( 114 L)
D 510 TL 32 ( 236 L)
D 520 AC 32 ( 11.34 Cr )
D 510 28 Non Stock item TL ( 6.95 Cr ) HSD Oil
D 520 28 Non Stock AC ( 106 L )
D 8 F 660 Escorting Duty ( 3.65 Crore)

Total Pageviews

About Me

My photo
Rajesh Gupta
View my complete profile